CMA Systems
CMA Systems
  • Home
  • Solutions
    • Metering
    • Systems Integration
    • Control & Automation
    • Functional Safety
    • Consultancy
    • SCADA Systems
  • Capabilities
    • Approval & Appraisal
  • Projects
    • Abu Dhabi LNG Terminal
    • UK Compressor Sites
    • Water Pumping Stations
    • Biomethane to Grid
    • Tank Overfill Protection
    • Compressor Station
    • Magnet and Sensor Install
  • Contact Us
  • More
    • Home
    • Solutions
      • Metering
      • Systems Integration
      • Control & Automation
      • Functional Safety
      • Consultancy
      • SCADA Systems
    • Capabilities
      • Approval & Appraisal
    • Projects
      • Abu Dhabi LNG Terminal
      • UK Compressor Sites
      • Water Pumping Stations
      • Biomethane to Grid
      • Tank Overfill Protection
      • Compressor Station
      • Magnet and Sensor Install
    • Contact Us
  • Home
  • Solutions
    • Metering
    • Systems Integration
    • Control & Automation
    • Functional Safety
    • Consultancy
    • SCADA Systems
  • Capabilities
    • Approval & Appraisal
  • Projects
    • Abu Dhabi LNG Terminal
    • UK Compressor Sites
    • Water Pumping Stations
    • Biomethane to Grid
    • Tank Overfill Protection
    • Compressor Station
    • Magnet and Sensor Install
  • Contact Us

Tank Overfill Protection

Project Description

In 2021, CMA Systems were awarded a contract to install new independent fuel product tanks Automatic Overfill Protection Systems (AOPS).


The following elements of the Tank systems were installed as part of this project:


  • Sensor inputs (level switch and interface unit)
  • Logic solver (safety controller)
  • Final elements (remotely actuated valve)


CMA Systems designed and configured the AOPS SIS (Safety Instrumented Systems) application software using Honeywell Designer Software package, necessary to meet the requirements of this specification.


Each AOPS monitors its respective product storage tank. On detection of an overfill event, the AOPS shall close the filling valve and alert personnel to the event.


The project included detailed functional safety software design and test documentation, to meet the requirements of the Client supplied Functional Safety Management Plan (FSMP), Safety Requirements Specification (SRS) and IEC61511.

  • Contact Us
  • Privacy Policy

CMA Systems Limited

Unit 2, Cherry Tree Business Park, Estate Road No. 5, Grimsby, DN31 2TX

Copyright © 2023 CMA Systems - All Rights Reserved.

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept

Appraisal & Approval

CMA Systems can now offer Software Engineering Appraisal & Approval.

Learn more